Illustration of Hänel storage RFQ advisory workshop with flow diagrams
Services

Hänel services that keep dense storage decisions guided by evidence

Most storage RFQs stall when density, selectivity and controls ownership are discussed in separate rooms. Hänel services keep concept screening, interface definition and acceptance language on one checklist so capital teams can compare vertical lift modules, carousels and dense AS/RS cells without inventing unowned pick-rate claims.

We work with warehouse operations directors, intralogistics engineers and IT/OT integration managers to freeze tray envelopes, SKU velocity bands, peak windows, fire and maintenance access, and WMS/WCS/PLC responsibility before equipment shortlists harden. Brownfield cutovers stay phased so live order waves retain fallback states.

Two service lanes for clearer evaluation

Icon cards keep advisory work separated from integration delivery so ownership stays visible.

Concept & density advisory

Translate load classes, inventory cube utilization targets and selectivity needs into comparable storage concepts. Each option documents fire aisle impact, recovery access and expansion seams so maximum density is never sold without the access trade-off.

  • Tray/tote envelope and residual capacity review
  • SKU velocity banding and replenishment lag
  • Selectivity vs dense sequencing trade study

Integration & acceptance delivery

Bind WMS, WCS, WES and PLC handshakes to measurable interface cycle times, exception timeouts and system availability language. FAT and SAT gates stay attached to the same load class used in design rate discussions.

  • Host message ownership matrix
  • FAT travel and interface scripts
  • SAT recovery and cutover windows

Frequent questions before a Hänel RFQ hardens

Yes when tray demand, clear height and pick concentration justify goods-to-person density. Small footprints still need fire and maintenance access, so we size capacity by usable locations and peak order lines per hour rather than by aisle count alone.

Before and after the Hänel evaluation frame

Side-by-side comparison shows what changes when RFQ data is complete.

Before

  • Brochure pick rates without SKU mix or peak window
  • Density targets that ignore fire and maintenance aisles
  • WMS and PLC messages with unclear exception ownership
  • Cutover plans that assume zero live-wave interference

After

  • Design rate stated with order profile and buffer occupancy
  • Density options paired with selectivity and recovery access
  • Interface cycle times and ownership matrix frozen early
  • Phased cutover with fallback states and SAT evidence

Start a guided Hänel service conversation

Send the operating boundary first. We respond with the missing data list before proposing equipment geometry.